Skip to the newsroom
Moving headlines
Philippine Peso Closes at Record Low of ₱61.888 as BSP Raises Policy Rate to 5%DAR Says ₱57.76 Billion in Agrarian Reform Debt Condoned Under RA 11953GSIS Earmarks Nearly ₱4.4 Billion in Emergency Loans for 166,789 Members and PensionersPAGASA: LPA Inside PAR May Become 'Pilandok' as Habagat Rain Risk BuildsPAF Completes 32-Helicopter Black Hawk Acquisition with Final Seven AircraftSenate Panel Backs Bill Setting 16 as Minimum Age for Social MediaPhilippine Peso Closes at Record Low of ₱61.888 as BSP Raises Policy Rate to 5%DAR Says ₱57.76 Billion in Agrarian Reform Debt Condoned Under RA 11953GSIS Earmarks Nearly ₱4.4 Billion in Emergency Loans for 166,789 Members and PensionersPAGASA: LPA Inside PAR May Become 'Pilandok' as Habagat Rain Risk BuildsPAF Completes 32-Helicopter Black Hawk Acquisition with Final Seven AircraftSenate Panel Backs Bill Setting 16 as Minimum Age for Social Media
Philippine time
FMB NewsFilipino Media Bulletin
Back to headlinesAugust 25, 2026, 1:00 PM PHT

Energy · Grid Reliability

NGCP Warns of Possible Load Dropping as Visayas Grid Enters Red Alert

Available capacity stood at 2,237 MW against projected peak demand of 2,530 MW, with possible controlled interruptions across several distribution utilities.

FMB News editorial visual for the Visayas power grid alertFMB News editorial visual
FMB News editorial visual accompanying the August 26 Visayas grid update; it does not depict actual grid facilities.FMB News editorial visualLicense details

Why this matters to Filipinos

FMB News connects the verified facts and evidence in this report to the decisions, costs, opportunities, and risks that may affect Filipinos, Philippine communities, and the country.

Editorial standard: Sources are listed below. Verified reporting, attributed claims, uncertainty, and analysis remain distinct.

Verified facts

What happened

The National Grid Corporation of the Philippines warned that manual load dropping may be implemented in parts of the Visayas on August 26 as limited generation and constrained imports from Mindanao kept the grid under red and yellow alerts.

As of 1 p.m., available capacity stood at 2,237 megawatts against projected peak demand of 2,530 MW. The grid was scheduled for yellow alert from 1 p.m. to 3 p.m., red alert from 3 p.m. to 9 p.m., and yellow alert again from 9 p.m. to 11 p.m.

Context

Context

NGCP reported 938.9 MW of unavailable capacity. Major contributors included the continued unavailability of the TVI 1, TVI 2 and KSPC 1 coal units, along with limited imports from Mindanao following additional unit outages there.

Manual load dropping is a controlled reduction in demand through temporary interruptions in selected areas. NGCP said the schedule could be cancelled if system conditions improve or actual demand is lower than forecast.

Filipino relevance

Why this matters

A red alert means available supply is insufficient to meet demand and regulating requirements, raising the risk of temporary interruptions. Businesses and households served by affected distribution utilities may need to prepare for short-notice changes while monitoring official advisories.

What to watch next

What to watch next

Watch NGCP and local distribution utilities for revised alert windows, cancellation of possible load dropping and confirmation that unavailable generating units have returned to service.

Sources and public record

Power Philippines: NGCP warns of possible manual load dropping across Visayas (August 26, 2026, 1:00 PM PHT)ABS-CBN News: Visayas grid on Red, Yellow Alerts on August 26 (August 26, 2026, 12:06 PM PHT)